![]() |
![]() |
#24 |
Senior Member
Join Date: Mar 2008
Location: Brockville, Ontario
Posts: 250
|
![]()
As I mentioned I've got all the way round. The hatch may end up as a duck under though, as there is only a very small length of rail between the edge and the turnout. I have a bit of an issue with the right hand turnouts only in Brockville even though they are the same throughout the layout.The leading drivers on 66 & 67 strike the frog and jump. 64 & 65 pass through just fine though. So as Foley's mountain is going to seperate Brockville from Westport I got a peco long radius turnout with an under mount switch motor.
The long view. I've also been working up from Lyn and have the fill completed. This is a house that Steve brought over and it never seemed to fit anywhere, until we cut it in half and it's the front of King st. This I scored at work. It was hanging up during operation and so was unreliable. Boss says throw it out I says Yes Boss. i did have it polished up it's a little tarnished right now, and I will have to make a mount for it as there is a stub of pipe protruding from the back. I hope to finish the rock cut this week. Cheers |
![]() |
![]() |
Bookmarks |
Thread Tools | |
Display Modes | |
|
|